Los Angeles Music Center Provided overall project management services for the Mark Taper Forum facility review, schematic drawings, construction drawings, and construction administration including review of structural, electrical, life safety, stage systems, current code compliance, budget, and seismic review. The company is currently under contract as the Owner’s Representative for the complete renovation, retaining all contractors and professionals, and overseeing the renovation. Scheduled completionJune 2008.
Universal Studios Japan - Provided commercial coordination of delivery and installation of over 1 million dollars of US made goods and services to the Park.
Tokyo Disneyland Various Venues provided various custom lighting fixtures and services, products, system integration.
Borgata Casino Provided high output Fiber Optic systems for underwater feature and Lobby effect.
North Carolina Children’s Museum Provided unique lighting fixtures for interior display use.
Universal Islands of Adventure Provided overall design and coordination of park-wide illumination control system (8000+ unique DMX Show Control devices)
Los Angeles Opera TRiP is providing complete facility review and long range facility planning for technology systems and architectural systems for the planned 2012 renovation of the Dorothy Chandler Pavilion.
Raytheon Corporation Provided overall design, and supply of exterior lighting systems for toll booth and security booth applications in Israel and Malaysia.
TV Globo Rio de Janeiro Provided overall coordination of (8) lighting control & staging systems for various studios
Metropolitan Museum of Art New York - Provided Exterior Building Façade Illumination System and unique fiber optic fixtures for Egyptian Artifacts and Display Case Lighting Systems.
International Cybernetics Provided design and illumination product to provide high output, low power consumption pavement illumination for their high speed (60 mph+) digital highway/road evaluation system.
Other clients include:
Disney (all parks and resorts); Teatro Colon (Buenos AiresProject Management for complete facility renovation in 1988/89); Argos Studios (Mexico CityProduction Facility Design and Supervision); Kalang Theatre (SingaporeFacility Review); National Air & Space MuseumSmithsonian, (Washington DCAircraft Lighting Systems design and implementation); EMP (SeattleVarious strange requests); Architect of the Capital (Washington DCControl System design for Senate and Congressional meeting rooms); Bellagio Hotel (O TheatreDimming and Control System design for swimming pool Showroom application); BITCC, (BeijingVarious Design and import/export projects); NCW,
(Hong KongVarious designs and import/export projects); Las Vegas Hilton Hotel (Star TrekShow Control System); Mirage Hotel (Sigfried & Roy Show Room); LuXor Hotel, (Show Control systems), and many others.
Brief Principal Information:
Thomas L. Folsom: Vice President Strand Lighting, Inc.Los Angeles California; President - Electronics Diversified, Inc., Hillsboro Oregon; Vice President Hoffend and Sons, Inc. Rochester, New York; President Media Specialties, Inc., San Antonio
Texas.